GovBidReport

GovBidReport → by trade → Fabricated Metal Product Manufacturing → New York

Fabricated Metal Product Manufacturing contracts in New York

9 open federal solicitations in fabricated metal product manufacturing (NAICS 332) to be performed in New York — 4 reserved for small businesses. From SAM.gov, updated daily.

HRD Shield EnclosureEnergy, Department of · due 2026-10-06Leg, Elevating, per Drawing # 11580032, Revision D, for 81MM Mortar, for the Watervliet ArsenalDept of Defense · due 2026-10-08Leg, Elevating, per Drawing # 11580032, Revision D, for 81MM Mortar, for the Watervliet ArsenalDept of Defense · due 2026-10-08Breech Ring Forgings per Drawing for the Watervliet ArsenalDept of Defense · due 2026-10-19Breech Ring Forging, Per Dwg #12591139 Rev B, for 105mm M20Dept of Defense · due 2026-10-23Lever, Operating Sear, per Drawing # 11582517, Revision A, for 105MM M20 Cannon, for the Watervliet ArsenalDept of Defense · due 2026-09-29 · Small businessGSA Class 5 IPS SafeDept of Defense · due 2026-09-29 · Small businessGSA Class 5 IPS SafeDept of Defense · due 2026-09-29 · Small businessRough Machined Spindles for the Watervliet ArsenalDept of Defense · due 2026-10-05 · Small business

Also see: all 1,343 open fabricated metal product manufacturing contracts (most federal work is location-flexible and open to New York firms).

Per solicitation · $249

Know every requirement before you bid

Open any solicitation above for the complete compliance breakdown — every required document, pass/fail requirement, and non-responsive trigger, read from all the official documents.

This report compiles and structures publicly posted government solicitation information from official procurement sources. It is not legal advice, is not affiliated with or endorsed by any government agency, and does not replace reading the full official solicitation and its amendments. Requirements, evaluation criteria, and deadlines are current as of the source posting — always confirm against the official solicitation and any addenda before you submit. Being responsive is your responsibility; verify every mandatory item in the official document.