GovBidReport

GovBidReportby trade → Petroleum and Coal Products Manufacturing

Petroleum and Coal Products Manufacturing government contracts

7 federal solicitations in petroleum and coal products manufacturing (NAICS 324) are open for response — 3 of them reserved for small businesses. From SAM.gov, updated daily.

Open solicitations
7
open for response now
Reserved for small business
3
Small business 3
Filter these 7 bids to your fit — free

Closing soonest

MGO Fuel Barge Cleaning ICO USS Lake ErieDept of Defense · due 2026-07-06 · CACrush Recycled Asphalt/Asphalt MillingsEnergy, Department of · due 2026-07-08 · Small business · location-flexibleDLA Energy - Bulk Petroleum Products Inland/East/Gulf Coast (IEG) ProgramDept of Defense · due 2026-07-16 · location-flexibleSolicitation Cog 6 (3.26), Camps & StationDept of Defense · due 2026-07-17 · Small business · VASolicitation Spe605-26-R-0212 - the Kingdom of Bahrain (1.99b Pc&S)Dept of Defense · due 2026-07-20 · location-flexibleSAP - Bulk Testing FuelsEnvironmental Protection Agency · due 2026-08-19 · Small business · MIWestern Pacific Bulk Fuels Purchase Program (WESTPAC )Dept of Defense · due 2026-10-01 · location-flexible

Petroleum and Coal Products Manufacturing contracts by state

4 of the 7 open solicitations are location-flexible or nationwide; the rest name a place of performance:

California1 open bidVirginia1 open bidMichigan1 open bid

Who's buying

Per solicitation · $99

Never lose a petroleum and coal products manufacturing bid on a technicality

Open any solicitation above and get the complete compliance breakdown: every required document, the pass/fail requirements, the evaluation criteria, and every non-responsive trigger — read from all of the official documents, generated the moment you order.

This report compiles and structures publicly posted government solicitation information from official procurement sources. It is not legal advice, is not affiliated with or endorsed by any government agency, and does not replace reading the full official solicitation and its amendments. Requirements, evaluation criteria, and deadlines are current as of the source posting — always confirm against the official solicitation and any addenda before you submit. Being responsive is your responsibility; verify every mandatory item in the official document.