GovBidReport → by trade → Textile Mills
Textile Mills government contracts
13 federal solicitations in textile mills (NAICS 313) are open for response — 8 of them reserved for small businesses. From SAM.gov, updated daily.
Open solicitations
13
open for response now
Reserved for small business
8
Small business 8
Closing soonest
40--Fiber Rope AssemblyDept of Defense · due 2026-08-24 · Small business · location-flexible17--Webbing Assembly,BarriDept of Defense · due 2026-08-24 · Small business · location-flexible53--Packing with RetainDept of Defense · due 2026-08-26 · Small business · location-flexible47--Hose Assembly,NonmetalDept of Defense · due 2026-08-17 · location-flexible42--Protective Cover,AiDept of Defense · due 2026-08-17 · location-flexible53--SealDept of Defense · due 2026-08-17 · Small business · location-flexibleNomex Fabric ClothDept of Defense · due 2026-08-18 · Small business · HI53--StrappingDept of Defense · due 2026-08-19 · Small business · location-flexiblePillow Ticking and FiberDept of Defense · due 2026-08-19 · location-flexiblePillow Ticking and Spun FiberDept of Defense · due 2026-08-19 · location-flexibleFabricDept of Defense · due 2026-08-19 · Small business · location-flexibleFabricDept of Defense · due 2026-08-19 · Small business · location-flexible
Textile Mills contracts by state
12 of the 13 open solicitations are location-flexible or nationwide; the rest name a place of performance:
Who's buying
- Dept of Defense — 13 open solicitations
Per solicitation · $99
Never lose a textile mills bid on a technicality
Open any solicitation above and get the complete compliance breakdown: every required document, the pass/fail requirements, the evaluation criteria, and every non-responsive trigger — read from all of the official documents, generated the moment you order.
This report compiles and structures publicly posted government solicitation information from official procurement sources. It is not legal advice, is not affiliated with or endorsed by any government agency, and does not replace reading the full official solicitation and its amendments. Requirements, evaluation criteria, and deadlines are current as of the source posting — always confirm against the official solicitation and any addenda before you submit. Being responsive is your responsibility; verify every mandatory item in the official document.