GovBidReport → by trade → Transportation Equipment Manufacturing → Oklahoma
Transportation Equipment Manufacturing contracts in Oklahoma
36 open federal solicitations in transportation equipment manufacturing (NAICS 336) to be performed in Oklahoma — 2 reserved for small businesses. From SAM.gov, updated daily.
Heat Exchanger, AirDept of Defense · due 2026-10-08Heat Exchanger, AirDept of Defense · due 2026-10-08FA811826R0054 - Overhaul of Magnetic Powder Clutch 1680-01-544-4848RKDept of Defense · due 2026-10-09Solicitation Notice for Overhaul B-1 Electro-Mechanical ActuatorsDept of Defense · due 2026-10-12KC-135 Center Console Refresh (CCR) Revision 2Dept of Defense · due 2026-10-13KC-135 Center Console Refresh (CCR) Revision 2Dept of Defense · due 2026-10-13KC-135 Center Console Refresh (CCR) Revision 2Dept of Defense · due 2026-10-13KC-135 Center Console Refresh (CCR) Revision 2Dept of Defense · due 2026-10-13Pump, Fuel, Jet Engin (3B)Dept of Defense · due 2026-10-13Cooler, Lubricating (3B)Dept of Defense · due 2026-10-14KC-135 Center Console Refresh (CCR) Revision 2Dept of Defense · due 2026-10-15KC-135 Center Console Refresh (CCR) Revision 2Dept of Defense · due 2026-10-15
All 36 — filter to your certifications →
Also see: all 1,031 open transportation equipment manufacturing contracts (most federal work is location-flexible and open to Oklahoma firms).
Per solicitation · $249
Know every requirement before you bid
Open any solicitation above for the complete compliance breakdown — every required document, pass/fail requirement, and non-responsive trigger, read from all the official documents.
This report compiles and structures publicly posted government solicitation information from official procurement sources. It is not legal advice, is not affiliated with or endorsed by any government agency, and does not replace reading the full official solicitation and its amendments. Requirements, evaluation criteria, and deadlines are current as of the source posting — always confirm against the official solicitation and any addenda before you submit. Being responsive is your responsibility; verify every mandatory item in the official document.