GovBidReport

GovBidReportset-asidesSDVOSB → Iowa

SDVOSB contracts in Iowa

3 open federal solicitations are reserved for SDVOSB firms with work to be performed in Iowa. Large businesses can't compete for these.

Reserved for Service-Disabled Veteran-Owned Small Businesses. Since 2024, SDVOSB status for set-asides requires SBA VetCert certification — self-certification no longer works for these. The solicitation will state exactly what proof is due with the bid.

You aren't limited to these 3. Another 302 open SDVOSB set-asides list no fixed place of performance — remote, nationwide, or delivery-based work a Iowa firm can bid on the same as anyone. See all 626 SDVOSB bids →

Closing soonest in Iowa

PN: 636A8-22-001, Reno 6th Floor Clinical Support (IC)Veterans Affairs, Department of · due 2026-09-08Muscatine-Louisa County Drainage District No. 13 � 2024 Event PL84-99 Flood RepairsDept of Defense · due 2026-08-18Muscatine-Louisa County Drainage District No. 13 � 2024 Event PL84-99 Flood RepairsDept of Defense · due 2026-08-18

SDVOSB set-asides in Iowa by trade

Heavy and Civil Engineering Construction2 reserved bids openConstruction of Buildings1 reserved bid open
Per solicitation · $99

A set-aside win still dies on a technicality

Reserved competition is smaller — but the compliance bar is identical, plus the status representations the set-aside itself requires. The $99 breakdown reads every solicitation document and lists each required form, pass/fail requirement, and non-responsive trigger before you commit to bidding.

Also see: all 626 open SDVOSB set-asides nationwide · every set-aside category

This report compiles and structures publicly posted government solicitation information from official procurement sources. It is not legal advice, is not affiliated with or endorsed by any government agency, and does not replace reading the full official solicitation and its amendments. Requirements, evaluation criteria, and deadlines are current as of the source posting — always confirm against the official solicitation and any addenda before you submit. Being responsive is your responsibility; verify every mandatory item in the official document.